Skip to content

You pour the slab.
We handle the paperwork that gets you paid.

Craftpath runs the back office for concrete contractors: pours and quantities, change orders, monthly pay apps, retainage and collections. Your PMs review and approve every step.

Foreman · Westfield Medical Office

L2 deck pour 3 done. 186 yards placed, tickets photographed.

March pay app

Logged
Elevated deck, L245%

Was 20% in February · 22 tickets attached

A month on a concrete job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Foremen text each pour: “L2 pour 3, 186 yards.”
    • Batch tickets and photos of forms, rebar and finished slabs saved.
    • Added thickness and extra work flagged the same day.
  2. 02

    Change orders

    • Added yards, rebar and labor priced at your unit prices.
    • The COR goes to the GC with the tickets, photos and RFI.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • Placed quantities reconciled against batch tickets before the cutoff.
    • Rebar and embeds on site billed as stored materials.
    • Final G702 and G703 with the conditional waiver and COI attached.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked by job, and flagged when the project hits substantial completion.

Billed the way your SOV is written.

Foundations, slab on grade, decks, by area or pour. Crews text yards placed, and Craftpath turns them into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Westfield Medical Office · Pay app #6

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Footings and foundations$210,000 scheduled100%$21,000
Slab on grade, Area A$148,000 scheduled100%$59,200
Rebar, stored on site$96,000 scheduledStored$18,400
Elevated deck, L2$264,000 scheduled45%$66,000
Work and stored this period
$164,600
Less 10% retainage
−$16,460
Current payment due
$148,140

Where it pays off.

L2 deck · 22 ticketsMatched

Tickets match the bill.

Batch tickets and crew texts are reconciled after every pour, so the yards you bill match the yards you placed, and the GC has the backup.

COR #6 · Thickened pad, L1Needs pricing

A thicker slab than drawn.

The engineer thickens the slab at the equipment pad. The foreman texts it in, and a COR for the added yards, rebar and labor is drafted at your unit prices.

Retainage · WestfieldTracked

First on site, last paid.

Your work finishes early and retainage comes back last. Craftpath tracks it by job and flags when the project hits substantial completion.

Common questions.

What concrete contractors ask before they start.

Yes. By cubic yard, square foot or pour, reconciled to your batch tickets, or by percent complete if that’s how your schedule of values is written. Your PM checks every line.

You do. When a foreman reports added thickness or extra work, Crafty collects the yards, tickets and photos, and Craftpath drafts the COR at your unit prices. Your PM sets the final price and approves it before anything goes to the GC.

Yes. Rebar and embeds delivered before they’re placed go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →

See it on your concrete jobs.

Bring a recent pay app. 30 minutes.

Book a call