Skip to content

You raise the steel.
We handle the paperwork that gets you paid.

Craftpath runs the back office for structural steel contractors: shop fabrication, stored steel, erection progress, monthly pay apps and collections. Your PMs review and approve every step.

Tower cranes over a building under construction at dusk

Foreman · Riverbend Lab Building

Sequence 3 erected and plumbed up. Deck starts Monday.

March pay app

Logged
Erection, Seq 3100%

Was 60% in February · 9 photos attached

A month on a steel job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Shop tonnage fabricated and staged, tracked by sequence.
    • Erection, bolt-up and deck progress texted in from the field.
    • Field fixes and added steel flagged the same day, with photos.
  2. 02

    Change orders

    • Added steel and field fixes priced by the ton or as T&M.
    • The COR goes to the GC with the RFI, revised drawings and photos.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • Fabricated steel in your yard billed as stored materials offsite.
    • A pencil draft by sequence, ready before the GC’s cutoff.
    • Final G702 and G703 with the conditional waiver, COI and mill certs attached.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked by job until it’s released at closeout.

Billed the way your SOV is written.

Fabrication, stored steel, erection and deck, by sequence. Craftpath turns shop and field progress into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Riverbend Lab Building · Pay app #8

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Fabrication, Seq 3$310,000 scheduled85%$77,500
Erection, Seq 3$142,000 scheduled100%$56,800
Seq 4, stored offsite$290,000 scheduledStored$64,000
Metal deck, Seq 2$88,000 scheduled60%$26,400
Work and stored this period
$224,700
Less 10% retainage
−$22,470
Current payment due
$202,230

Where it pays off.

Stored offsite · Seq 4$64,000

Steel sitting in your yard.

Sequence 4 is fabricated but the site isn’t ready. Craftpath bills it as stored offsite, with the bill of sale, insurance certificate and photos the GC requires.

COR #12 · Connection fix, grid CNeeds pricing

A connection that doesn’t fit.

The erector texts that a connection at grid C doesn’t match the field condition. The fix is logged with photos and drafted into a COR, tied to the RFI, for your PM.

Pay app #7 · ReturnedResubmitted

The pay app comes back.

The GC kicks back the draw over a missing mill cert for the stored steel. It’s attached and resubmitted the same day once you sign off.

Common questions.

What steel contractors ask before they start.

Yes. Shop fabrication, stored steel, erection and deck bill as their own lines, by sequence, the way your schedule of values is written. Your PM checks every line before it goes out.

You do. When the field reports a fix or added steel, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR by the ton or as T&M, tied to the RFI. Your PM sets the final price and approves it before anything goes to the GC.

Yes, when your contract allows offsite storage. Fabricated steel waiting in your yard bills as stored offsite, with the bill of sale, insurance certificate and photos the GC requires. Your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →

See it on your steel jobs.

Bring a recent pay app. 30 minutes.

Book a call