The gear shows up early.
Switchgear lands six weeks before it’s set. Craftpath bills it as stored materials that month, with the invoice, delivery ticket and photos the GC asks for.
Craftpath runs the back office for electrical contractors: T&M tickets, change orders, monthly pay apps and collections. Your PMs review and approve every step.

Foreman · Riverside Medical
L3 branch rough-in about 60. Pulled feeders to panels 3A and 3B today.
March pay app
LoggedWas 30% in February · 4 photos attached
What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.
Feeders, branch rough-in by floor, gear, fixtures. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.
Riverside Medical · Pay app #7
Continuation sheet · Period to March 31
| Description of work | Scheduled | Complete | This period |
|---|---|---|---|
| Feeders$186,000 scheduled | $186,000 | 70% | $37,200 |
| Branch rough-in, L3$94,000 scheduled | $94,000 | 60% | $28,200 |
| Switchgear, stored on site$212,000 scheduled | $212,000 | Stored | $96,500 |
| Fixtures and devices$148,000 scheduled | $148,000 | 10% | $14,800 |
What electrical contractors ask before they start.
Yes. Craftpath follows your schedule of values as it’s written: feeders, rough-in by floor, gear, fixtures. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.
You do. When a foreman reports extra work, Crafty collects the hours, material and photos, and Craftpath drafts the ticket and COR at your labor rates and markup. Your PM sets the final price and approves it before anything goes to the GC.
Yes. Gear and fixtures that arrive before they’re installed go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.
No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.
Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.
Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.
No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.
Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.
Bring a recent pay app. 30 minutes.