You wire the building.
We handle the paperwork that gets you paid.

Craftpath runs the back office for electrical contractors: T&M tickets, change orders, monthly pay apps and collections. Your PMs review and approve every step.

Electrician pulling wire into a cable tray from a scissor lift

Foreman · Riverside Medical

L3 branch rough-in about 60. Pulled feeders to panels 3A and 3B today.

March pay app

Logged
Branch rough-in, L360%

Was 30% in February · 4 photos attached

A month on an electrical job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Foremen text progress by floor and area: “L3 rough-in about 60.”
    • Photos of pulled wire, set gear and trimmed devices land in the job file.
    • Extra work becomes a T&M ticket the same day, with hours and material.
  2. 02

    Change orders

    • T&M tickets priced at your labor rates and markup, then held for your PM.
    • The COR goes to the GC with tickets, photos and the RFI it came from.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • A pencil draft by floor and system, ready before the GC’s cutoff.
    • Switchgear and fixtures on site billed as stored materials, with invoices.
    • Final G702 and G703 with the conditional waiver and COI attached.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked by job until it’s released at closeout.

Billed the way your SOV is written.

Feeders, branch rough-in by floor, gear, fixtures. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Riverside Medical · Pay app #7

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Feeders$186,000 scheduled70%$37,200
Branch rough-in, L3$94,000 scheduled60%$28,200
Switchgear, stored on site$212,000 scheduledStored$96,500
Fixtures and devices$148,000 scheduled10%$14,800
Work and stored this period
$176,700
Less 10% retainage
−$17,670
Current payment due
$159,030

Where it pays off.

Stored materials$96,500

The gear shows up early.

Switchgear lands six weeks before it’s set. Craftpath bills it as stored materials that month, with the invoice, delivery ticket and photos the GC asks for.

COR #14 · Lobby receptaclesNeeds pricing

Tuesday’s extra work, priced by Thursday.

The GC moves 14 receptacles in the lobby. The foreman texts it in, it becomes a T&M ticket, and a COR with labor, material and markup waits for your PM.

Pay app #6 · ReturnedResubmitted

The pay app comes back.

The GC kicks it back over a missing conditional waiver. Craftpath pulls the right form, attaches it, and resubmits the same day once you sign off.

Common questions.

What electrical contractors ask before they start.

Yes. Craftpath follows your schedule of values as it’s written: feeders, rough-in by floor, gear, fixtures. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.

You do. When a foreman reports extra work, Crafty collects the hours, material and photos, and Craftpath drafts the ticket and COR at your labor rates and markup. Your PM sets the final price and approves it before anything goes to the GC.

Yes. Gear and fixtures that arrive before they’re installed go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →