Craftpath runs the back office for mechanical contractors: field progress, stored equipment, change orders, monthly pay apps and collections. Your PMs review and approve every step.

Foreman · Lakeview Lofts

RTU-2 and RTU-3 set on the roof. L2 duct about 75.

March pay app

Logged
Ductwork, L275%

Was 50% in February · 6 photos attached

A month on a mechanical job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Foremen text progress by system and floor: “L2 duct about 75.”
    • Equipment sets, piping and insulation logged with photos.
    • Extra work flagged the same day, with hours and material.
  2. 02

    Change orders

    • Field changes priced at your rates, with equipment quotes attached.
    • The COR goes to the GC with photos and the RFI or ASI behind it.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • A pencil draft by system and floor, ready before the GC’s cutoff.
    • RTUs, AHUs and chillers on site billed as stored materials.
    • Final G702 and G703 with the conditional waiver, COI and certified payroll when required.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked to closeout, with the O&Ms and TAB report it’s waiting on.

Billed the way your SOV is written.

Ductwork by floor, hydronic piping, equipment, controls. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Lakeview Lofts · Pay app #5

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Ductwork, L2$168,000 scheduled75%$42,000
Hydronic piping$224,000 scheduled40%$33,600
RTUs, stored on site$236,000 scheduledStored$118,400
Controls$86,000 scheduled10%$8,600
Work and stored this period
$202,600
Less 10% retainage
−$20,260
Current payment due
$182,340

Where it pays off.

Stored materials$118,400

Rooftop units, billed before the crane.

Two RTUs arrive a month before the pick. Craftpath bills them as stored materials with the invoice, delivery ticket and photos, so the cash isn’t waiting on the crane.

COR #21 · L2 duct rerouteNeeds pricing

A reroute, priced the same week.

A beam conflict forces a duct reroute on L2. The foreman texts photos, and a COR with labor, material and markup is drafted for your PM to price and approve.

Retainage · Lakeview LoftsTracked

Closeout without the scramble.

Retainage is tracked by job, with the O&M manuals, warranties and TAB report it’s waiting on listed in one place.

Common questions.

What mechanical contractors ask before they start.

Yes. Craftpath follows your schedule of values as it’s written: ductwork by floor, piping, equipment, controls. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.

You do. When a foreman reports a field change, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR at your rates with the equipment quotes attached. Your PM sets the final price and approves it before anything goes to the GC.

Yes. Rooftop units and air handlers that arrive before they’re set go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →